MIL-PRF-81757/9D
TABLE VII. Group B inspection. Delete table VII of MIL-PRF-81757 and substitute the
table shown below.
TABLE VII. Group B inspection.
Test
Examinations and tests 1/
Requirement
Test
no.
paragraph 1/
paragraph 1/
Subgroup I:
I-1
Dimensions and weight
Reqmt 2 (N), 3.10.8 (S), 3.10.9 (G) 4.5.8 (G)
I-2
Vented filler cap test
3.6(G), 3.7.12(G), 3.8.6(G), 3.9(G),
4.5.5 (G)
(two vented filler caps
3.10.5 (G)
per battery)
Subgroup II:
II-1
Initial capacity discharge
Reqmt 3 (N), 3.10.14 (S)
4.5.13 (G)
Subgroup III:
III-1
Initial capacity discharge
Reqmt 3 (N), 3.10.14 (S)
4.5.13 (G)
III-2
Internal pressure test
3.9 (G), 3.10.26 (G)
4.5.26 (G)
1/ The notations in parentheses specify the source of the paragraph. "(G)" means the
paragraph is as shown in MIL-PRF-81757. "(S)" shows that the paragraph has been modified
by MIL-PRF-81757/9. "(N)" indicates that a new paragraph or requirement has been added by
MIL-PRF-81757/9.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business