MIL-PRF-81757/9D
1/ The notations in parentheses specify the source of the paragraph. "(G)" means the
paragraph is as shown in MIL-PRF-81757. "(S)" shows that the paragraph has been modified by
MIL-PRF-81757/9. "(N)" indicates that a new paragraph or requirement has been added by
MIL-PRF-81757/9.
TABLE IV. Qualification inspection of components and materials. Delete and substitute
the following;
TABLE IV. Qualification inspection of components and materials.
Requirement
Part
Examinations and tests
paragraph 1/
Test paragraph 1/
Metal parts 2/
Electrolyte resistance
3.8.1 (G),
4.5.2 (G)
3.8.4 (G),
3.9 (G),
3.10.2 (G)
Components 3/, elastomeric
Electrolyte resistance;
3.8.1 (G),
4.5.3 (G)
materials
dielectric strength and
3.8.4 (G),
4.5.27 (G)
insulation resistance
3.9 (G),
3.10.3 (S),
3.10.27 (G)
Plastic parts
Electrolyte absorption
3.8.5 (G),
4.5.4 (G)
3.9 ( G),
3.10.4 (G)
Vented filler
Electrolyte resistance;
3.9 (G),
4.5.3 (G),
caps
vented filler cap test
3.10.3 (G)
4.5.5 (G),
3.10.5 (G),
4.5.6 (G)
3.10.6 (G)
1/ The notations in parentheses specify the source of the paragraph. "(G)" means the paragraph
is as shown in MIL-PRF-81757. "(S)" shows that the paragraph has been modified by
MIL-PRF-81757/9.
2/ Including but not limited to the container, cover, and latches; external cell terminal hardware;
and intercell connectors and hardware.
3/ Including but not limited to the vented filler caps, receptacles, and parts made of elastomers.