MIL-PRF-29595A
indicated by a single digit preceded by "0". When the inspection lot is compiled during the first
three or the last three working days of the month, the manufacturer is permitted to use either that
month or the nearest adjacent month as the coded month. For example, lot code 0409-12
indicates the lot was compiled in April 2009 and was the twelfth lot.
3.7.7 Warnings. The cell or battery shall be marked with the following warnings and shall
be placed in accordance with the applicable specification sheet. The warning shall be as follows:
For Use in Designated Equipment Only
Caution
Lithium Ion Battery
Recharge in accordance with authorized/approved instructions
Do not pierce, cannibalize, mutilate, puncture, short circuit, expose to
temperatures above 85° C, or incinerate. Use in equipment approved
for this cell or battery. Do not throw in trash.
3.8 System safety design requirements.
3.8.1 General safety requirements. The cell or battery, when subjected to any tests specified
in section 4, shall not show:
a. Explosion, flame, fire, venting of solid material, disassembly, cell leakage, or rupture
of cell or battery within 24 hours after the completion of the test. The cell or battery shall not
produce shrapnel within 24 hours after the completion of the test.
b. Dimensional distortion beyond specified limits.
c. Improper operation of safety devices that create an unsafe condition.
d. Cracking of cases or covers.
e. Radical current or voltage fluctuations during any test. Degradation of electrical
performance beyond limits specified by the test requirements, if applicable.
f. Mechanical failure of any part.
g. Liquid leakage or spilling of liquid at any time during the test. Liquid discharge
visible from outside the battery or detectable within the battery shall not occur during testing to
7