MIL-PRF-8565/4D (AS)
TABLE I. Qualification inspection and conformance inspection of batteries.
Qualification inspection
Conformance
inspection
Test
Examinations and tests
Sample
Group B
Requirement
Test
Group A
number
paragraph
paragraph
sample 1
number
sample
number
100%
1
2
3
1
2
3.8.1
4.5.1
X
X
1
X
X
X
INCOMING INSPECTION
3.5, 3.6,
4.5.2
2
X
X
X
X
X
VISUAL AND MECHANICAL
X
3.8.2, table II
EXAMINATION
1/
Reqmt 2, 3.8.3
4.5.3
X
X
3
X
X
DIMENSIONS AND WEIGHT
1/
3.7, 3.8.4
4.5.4
4
X
X
X
X
X
DIELECTRIC STRENGTH AND
INSULATION RESISTANCE
TEST
1/
3.7, 3.8.5
4.5.5
5
X
X
X
X
STRENGTH OF VENT
X
TUBES TEST
4.5.6
X
X
X
6
X
X
ELECTRICAL TEST
PREPARATION
X
X
X
4.5.7
X
7
X
X
CAPACITY DISCHARGE
Reqmt 3, 3.8.6
X
X
4.5.28.1
X
8
AIRCRAFT EMERGENCY
3.8.16
LOADS
X
X
9
4.5.28.2
X
AIRCRAFT START-UP LOADS
3.8.16
X
X
X
10
4.5.29.1
HALF-HOUR CHARGE TEST
3.7, 3.8.17.1
X
X
X
11
ONE-HOUR CHARGE TEST
4.5.29.2
3.7, 3.8.17.2
X
12
X
4.5.10
CYCLING TEST
3.8.9, reqmt (1)
of table III
X
13
CAPACITY DISCHARGE
4.5.11
3.8.6, reqmt (2)
AT 49°C (120°F)
of table III
X
X
14
4.5.13
DISCHARGE WHILE
3.5.9, reqmt (5)
INVERTED
of table III
X
X
15
4.5.14
ALTITUDE TEST
3.7, 3.5.9,
3.8.10
X
16
4.5.15
SHOCK TEST (BASIC
3.7, 3.8.10
DESIGN)
X
X
17
4.5.16
TEMPERATURE SHOCK TEST
3.7, 3.8.10
11
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business